Pace - Tracking your CEU's HistoryOrderFaq'sFeaturesSupportDownloadContact Us
Download

PACE 4.2 "PActive" Patch

Description
When trying to print the "Activity List" report you recevied the error "SQL: Column 'PACTIVE' is not found"

This Version: 4.2 patch 004
Requires Version: 4.2

How do I Extract a Zip file?

Step 1: Double click the zip file that you want to unzip
Step 2: Right click on the file(s) that you want to extract
Step 3: Select the target directory | Click "Extract"




To install this update:
  • Make sure all other users are out of PACE
  • Backup your PACE data
  • Download this file to your PACE folder
  • Launch PACE
  • The RunOnce .APP file will automatically execute when you start PACE
  • This Run Once update will add new fields to the Staff & Presenters table
  • Rebuild the database after the update has been applied
What this update does:
  • Adds an Active field in the Person table, allows you to mark a person as inactive or active which most reports can use as a search criteria. The default value is Active.
  • Adds Home and Work e-mail address fields to the Person table. The default values are blank.
  • Adds a Continuation Term field to the Person table. This allows for each person to have a different length continuation term in years. The default is 5 years when this field is first added. The default for new staff members is based on the value in the district table (Tools | Options | Defaults tab).
Note: This patch can be re-applied without losing any existing data.






Frequently Asked Questions

Pace Features
PACE 4.2 improves upon prior
versions with more intuitive screens,
better navigation and new reports.
Click here to learn more.

Contact Us
Call us at (860) 678.3530 or email us.


Copyright © 2008 by Walker Systems Support. All Rights Reserved. Website developed by Walker Systems Support.